Latchways® Vertical System - How to Install (Prerequisites & Vertical System Installer for Other Structures)
Course Aim
This is the generic foundation level for MSA vertical installers (Half-day morning session). This is a compulsory module and is to be delivered with Latchways® Vertical System – How to Install to Lattice Towers, Clamp Bracket, Climbing Rail, Monopole & T-spine Ladder (Half-day afternoon session).
This module is for persons who are required to carry out installations, and inspections and use Latchways vertical systems within the Telecommunications or other sectors within industry who may require installing a climb path and a vertical fall protection system.
Latchways® Vertical System - How to Install (Prerequisites & Vertical System Installer for Other Structures)
Course Content
- Understand the concept of use for all Latchways vertical systems
- Ensure the structural requirements for fixing vertical Latchways systems are met
- Identify and use a given component as part of a Latchways vertical system for a given structure
- Specify a Latchways vertical system for a given structure
- Understand your responsibility and the requirement for the production of a health and safety plan prior to a system installation
- Perform pre-installation requisites prior to starting the installation
- Select and use the correct tools in order to install a vertical system
- Understand the concept of use and employment of a given Guided Type Fall Arrest device
- Understand the components and their function of a given GTFA device
Learning Outcomes
To demonstrate an understanding of the pre-installation requisites that are to be implemented prior to a vertical Latchways system installation.
Delegates will be able to:
Install a Latchways vertical monopole system on a suitable structure
- Install a vertical system to a steel monopole using a single fix method (drill and tap or bolt through)
- Install a vertical system to a steel monopole using monopole clamps
- Install a vertical system to a steel monopole using a T-Spine
- Install a vertical system to a concrete monopole using clamps
Install a Latchways vertical system on a lattice structure
- Install a vertical system to a lattice structure fitted with top and bottom anchor mounting plates
- Install a Latchways vertical system to a circular hollow section ladder.
Install a climb path using MonoStep
- Install a climb path using MonoStep to a monopole
- One Day (including 1 additional module)
- Min 3 Max 6 people
- Training Academy or on-site
- MSA Latchways Certificate
- Valid for 3 years
Or call our booking team on 0114 250 7411